<P><FONT SIZE=2 FACE="Arial">Hi,</FONT>

<BR><FONT SIZE=2 FACE="Arial">&nbsp;&nbsp;&nbsp; I have two UWL questions I have not been able to find answers to:</FONT>
</P>

<P><FONT SIZE=2 FACE="Arial">1.&nbsp; How can I make use of the due date column for latest end or latest start for a task?&nbsp; Is there a link between the task deadlines and the due date or is this only used for ad-hoc tasks created via the UWL?</FONT></P>

<P><FONT SIZE=2 FACE="Arial">2.&nbsp; How can I disable forwarding via the config or the uwl.standard.xml file?</FONT>
</P>

<P><FONT SIZE=2 FACE="Arial">We are on EP6 SP17 with a 4.6 system.</FONT>
</P>

<P><FONT SIZE=2 FACE="Arial">Thanks,</FONT>

<BR><FONT SIZE=2 FACE="Arial">Jacob</FONT>
</P>

<P><FONT SIZE=2 FACE="Arial">Jacob Crane</FONT>

<BR><FONT SIZE=2 FACE="Arial">Ext:&nbsp; 3-2629</FONT>

<BR><FONT SIZE=2 FACE="Arial">Cell:&nbsp; 678-642-8094</FONT>
</P>