<div>Folks,</div>
<div>I understand from various&nbsp; Workflow groups that there is a lot of change in SAP Workflow going from 4.6C to ECC 6.0 or even ECC 5.0. What I would like to understand&nbsp; is what is this lot of change ? Has the functionality (what workflow can do) changed or has the way it is code and designed change. Would it be safe to assume that Workflow in ECC will continue to do what it does in 
4.6C at the minimum. In an upgrade scenario (4.6c - ECC5.0) should a lot of time be planned for upgrades of Workflow ?</div>
<div>If any one has links articles, whitepages&nbsp;etc on the above or would like share their own upgrade experience I would be very keen to read/ hear the same.</div>
<div>&nbsp;</div>
<div>Thanks is advance for you assistance with the above.</div>
<div>Shalini Sabnani</div>