<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2800.1276" name=GENERATOR></HEAD>
<BODY>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2>Hi,</FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial size=2>Since we frequently 
update our workflows, we have kept the event trace&nbsp;'ON' in our production 
system for traceability.</FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial size=2>However 
that&nbsp;filled SWELOG to an enormous size and we need to create a job to 
periodically delete the trace. How long should one keep an event trace in a 
production environment?? </FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial size=2>30 60 or 90 days?? I 
know there is no standard but still any suggestions !!!</FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2>Cheers</FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2>Manish</FONT></SPAN></DIV>
<DIV><SPAN class=684372702-06122005><FONT face=Arial 
size=2></FONT></SPAN>&nbsp;</DIV></BODY></HTML>