<br><font size=2 face="sans-serif">Hello.</font>
<br>
<br><font size=2 face="sans-serif">I need to set milestones in my workflow. The idea is make an application that access the status of a workflow and shows to the user the milestones completed.</font>
<br><font size=2 face="sans-serif">How can I do it? Is there any type of step for this purpose? </font>
<br>
<br><font size=2 face="sans-serif">Any help will be appreciated. </font>
<br><font size=2 face="sans-serif">Carlos</font>