<br><font size=2 face="sans-serif">I have a question regarding the replace
functionality in the following scenario.</font>
<br>
<br><font size=2 face="sans-serif">A workitem is sent to position 1 which
contains many users. &nbsp;One of those users executes the workitem, then
forwards it onto position 2. &nbsp;Someone within position 2 executes the
workitem, then does a replace. &nbsp;What happens with the replace is the
workitem is now sent to all the people in both position 1 AND position
2. &nbsp; &nbsp;Does anyone know if this is correct, or a bug? &nbsp;My
assumption was that it would only sent it to those people in position 1
- the SAP help states that on a replace the workitem will be sent to the
original recipients.</font>
<br>
<br><font size=2 face="sans-serif">We are on a 4.7 system.</font>
<br><font size=2 face="sans-serif"><br>
Tami Elliott</font>
<br><font size=2 face="sans-serif">Eastman Kodak Company</font>
<br><font size=2 face="sans-serif">Rochester, NY<br>
(585)724-4927<br>
<br>
</font>