<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.2800.1505" name=GENERATOR></HEAD>
<BODY style="MARGIN: 4px 4px 1px; FONT: 10pt Tahoma">
<DIV>Deadline is on the Requested Start. </DIV>
<DIV>The task is calling a method in obj BUS7051 (Notification obj). </DIV>
<DIV>Right now I am assuming it was caused by a locked HR object. </DIV>
<DIV>No dumps and nothing I can see that is causing the issue. </DIV>
<DIV>&nbsp;</DIV>
<DIV>I have some tasks still sitting "inProcess" status. </DIV>
<DIV>I know we have no current locks on the objects in questions. </DIV>
<DIV>I can only assume the entries were removed from the table </DIV>
<DIV>that holds this information on deadline monitoring. </DIV>
<DIV>&nbsp;</DIV>
<DIV>Any idea what table holds this information for&nbsp;deadline monitoring? </DIV>
<DIV>&nbsp;</DIV>
<DIV>Thanks!</DIV>
<DIV><BR><BR>&gt;&gt;&gt; KJETILK@statoil.com 8/4/2005 0:39 &gt;&gt;&gt;<BR></DIV>
<DIV style="FONT: 10pt Arial; COLOR: #000000">
<DIV dir=ltr align=left><SPAN class=884283405-04082005>Is your deadline on latest end? Not that I really think it matters much... we have similar problems. One possible problem is insufficient error checking in the code, i.e. a short dump occurs. Another possibility is deadlock problems which are not detected in the code, so it tries but can't perform updates. I can't recall if that causes short dumps in our system.</SPAN></DIV>
<DIV align=left>-- </DIV>
<DIV align=left>Kjetil Kilhavn, Statoil KTJ IT BKS</DIV>
<DIV>&nbsp;</DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma><B>From:</B> sap-wug-bounces@mit.edu [mailto:sap-wug-bounces@mit.edu] <B>On Behalf Of </B>Rick Sample<BR><B>Sent:</B> 3. august 2005 16:57<BR><B>To:</B> sap-wug@mit.edu<BR><B>Subject:</B> Object requested is currently locked by user WF-BATCH - questions 4.6c<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV>I have a Task with a Deadline timer that gets stuck inprocess sometimes. </DIV>
<DIV>I looked at SM58 and ST22 and don't see any issues. </DIV>
<DIV>I manually set these to Ready and the WF&nbsp;continued executing. </DIV>
<DIV>&nbsp;</DIV>
<DIV>I have Deadline monitoring running every 3 minutes (in Dev client). </DIV>
<DIV>Not sure why these Tasks were stuck or why they did not get picked </DIV>
<DIV>up eventually by&nbsp;RSWWDHEX.</DIV>
<DIV>&nbsp;</DIV>
<DIV>Any help is appreciated.</DIV>
<DIV>&nbsp;</DIV>
<DIV>Thanks!</DIV>
<DIV>&nbsp;</DIV>
<P></P>
<P><FONT size=1>-------------------------------------------------------------------<BR>The information contained in this message may be CONFIDENTIAL and is<BR>intended for the addressee only. Any unauthorised use, dissemination of the<BR>information or copying of this message is prohibited. If you are not the<BR>addressee, please notify the sender immediately by return e-mail and delete<BR>this message.<BR>Thank you.</FONT> </P></DIV></BODY></HTML>