<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD><TITLE>Nachricht</TITLE>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.2800.1106" name=GENERATOR></HEAD>
<BODY>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN class=972474207-02062005>Hi
Amit,</SPAN></FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN
class=972474207-02062005></SPAN></FONT> </DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN class=972474207-02062005>You
can built a parallel processing in Your workflow, which ends, if one of the both
branches is completed. One branch includes Your current workflow and the other
consits of a Wait Step , which waits for the event 'CHANGED' of
BUS2012.</SPAN></FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN
class=972474207-02062005></SPAN></FONT> </DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN class=972474207-02062005>Best
regards</SPAN></FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN
class=972474207-02062005>Michael Ludwig</SPAN></FONT></DIV>
<DIV><FONT face=Arial color=#0000ff size=2><SPAN class=972474207-02062005>rku.it
GmbH</SPAN></FONT></DIV>
<BLOCKQUOTE style="MARGIN-RIGHT: 0px">
<DIV></DIV>
<DIV class=OutlookMessageHeader lang=de dir=ltr align=left><FONT face=Tahoma
size=2>-----Ursprüngliche Nachricht-----<BR><B>Von:</B>
sap-wug-bounces@mit.edu [mailto:sap-wug-bounces@mit.edu] <B>Im Auftrag von
</B>Amit Moghe<BR><B>Gesendet:</B> Donnerstag, 2. Juni 2005
08:34<BR><B>An:</B> sap-wug@mit.edu<BR><B>Cc:</B>
amitpmoghe@rediffmail.com<BR><B>Betreff:</B> Cancelling the previous
workitem<BR><BR></FONT></DIV>
<P>Hi Workflow Gurus,<BR><BR>I am new to workflow and need some help.<BR><BR>I
have a workflow for which I am using 'CHANGED' event of the business object
BUS2012 (Purchase Order) as the triggering event. When a user changes a
particular PO, this workflow starts. But before it is completed if there is
another change to the same PO, then, one more workitem is started.<BR><BR>My
requirement is that if there is change to the PO, then, it should delete the
previous workitem and start a new workitem. Can you please advise me as to how
this can be achieved?<BR><BR>Thanks in
advance.<BR><BR>Regards,<BR>Amit<BR></P><BR><BR><A
href="http://clients.rediff.com/signature/track_sig.asp" target=_blank><IMG
hspace=0
src="http://ads.rediff.com/RealMedia/ads/adstream_nx.cgi/www.rediffmail.com/inbox.htm@Bottom"
border=0 NOSEND="1"></A> </BLOCKQUOTE></BODY></HTML>