<br><font size=2 face="sans-serif">I have a synchronous dialog task that does a call transaction to VM01; this task also has a Confirm End of Processing on it. When the user executes the workitem, creates the Hazardous material, saves it and backs out, the Confirm End of Processing Screen does not appear. I took the Confirm End of Processing off of the task, but when the workitem is executed and the material saved, the step does not complete. It's like there is a complete disconnect between this transaction and the workflow. I have another task that basically does the same thing using MM02, and this one works fine.</font>
<br>
<br><font size=2 face="sans-serif">I'm stuck as to how to get the workflow to continue processing....I thought about using a terminating event for the step, but the event that gets raised is A00MARA CHANGED, and the object A00MARA no longer exists in 4.7. If the user goes back into his inbox, executes the workitem again, and then just backs out of the VM01 transaction the workflow continues on..............but I doubt if the user wants to execute this workitem twice.</font>
<br>
<br><font size=2 face="sans-serif">Any suggestions on how to deal with this?</font>
<br>
<br><font size=2 face="sans-serif">Thanks,<br>
Tami</font>
<br><font size=2 face="sans-serif">Eastman Kodak<br>
<br>
<br>
</font>