<br><font size=2 face="sans-serif">I have a synchronous dialog task that does a call transaction to VM01; this task also has a Confirm End of Processing on it. &nbsp;When the user executes the workitem, creates the Hazardous material, saves it and backs out, the Confirm End of Processing Screen does not appear. I took the Confirm End of Processing off of the task, but when the workitem is executed and the material saved, the step does not complete. &nbsp;It's like there is a complete disconnect between this transaction and the workflow. &nbsp;I have another task that basically does the same thing using MM02, and this one works fine.</font>
<br>
<br><font size=2 face="sans-serif">I'm stuck as to how to get the workflow to continue processing....I thought about using a terminating event for the step, but the event that gets raised is A00MARA CHANGED, and the object A00MARA no longer exists in 4.7. &nbsp;If the user goes back into his inbox, executes the workitem again, and then just backs out of the VM01 transaction the workflow continues on..............but I doubt if the user wants to execute this workitem twice.</font>
<br>
<br><font size=2 face="sans-serif">Any suggestions on how to deal with this?</font>
<br>
<br><font size=2 face="sans-serif">Thanks,<br>
Tami</font>
<br><font size=2 face="sans-serif">Eastman Kodak<br>
<br>
<br>
</font>