<br><font size=2 face="sans-serif">Tami,</font>
<br>
<br><font size=2 face="sans-serif">At a quick glance, it looks like your
A00MARA CHANGED event is generated through SWEC event linkage for change
documents. &nbsp;If you modify the linkage or create a new instance linkage
with the MATERIAL change document modeled after the A00MARA CHANGED one,
you should be able to generate an event to an active business object which
would allow you to follow through with your terminating event idea.</font>
<br>
<br><font size=2 face="sans-serif">TT</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td width=40%><font size=1 face="sans-serif"><b>tamara.elliott@kodak.com</b>
</font>
<br><font size=1 face="sans-serif">Sent by: sap-wug-bounces@mit.edu</font>
<p><font size=1 face="sans-serif">05/10/2005 08:09 AM</font>
<table border>
<tr valign=top>
<td bgcolor=white>
<div align=center><font size=1 face="sans-serif">Please respond to<br>
&quot;SAP Workflow Users' Group&quot; &lt;sap-wug@mit.edu&gt;</font></div></table>
<br>
<td width=59%>
<table width=100%>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">To</font></div>
<td><font size=1 face="sans-serif">&quot;SAP Workflow Users' Group&quot;
&lt;sap-wug@mit.edu&gt;</font>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">cc</font></div>
<td>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">Subject</font></div>
<td><font size=1 face="sans-serif">Workitem not completing after Call Transaction
to VM01</font></table>
<br>
<table>
<tr valign=top>
<td>
<td></table>
<br></table>
<br>
<br>
<br><font size=2 face="sans-serif"><br>
I have a synchronous dialog task that does a call transaction to VM01;
this task also has a Confirm End of Processing on it. &nbsp;When the user
executes the workitem, creates the Hazardous material, saves it and backs
out, the Confirm End of Processing Screen does not appear. I took the Confirm
End of Processing off of the task, but when the workitem is executed and
the material saved, the step does not complete. &nbsp;It's like there is
a complete disconnect between this transaction and the workflow. &nbsp;I
have another task that basically does the same thing using MM02, and this
one works fine.</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
I'm stuck as to how to get the workflow to continue processing....I thought
about using a terminating event for the step, but the event that gets raised
is A00MARA CHANGED, and the object A00MARA no longer exists in 4.7. &nbsp;If
the user goes back into his inbox, executes the workitem again, and then
just backs out of the VM01 transaction the workflow continues on..............but
I doubt if the user wants to execute this workitem twice.</font><font size=3>
<br>
</font><font size=2 face="sans-serif"><br>
Any suggestions on how to deal with this?</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
Thanks,<br>
Tami</font><font size=3> </font><font size=2 face="sans-serif"><br>
Eastman Kodak<br>
<br>
</font><font size=2><tt>_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
http://mailman.mit.edu/mailman/listinfo/sap-wug<br>
</tt></font>
<br>