<br><font size=2 face="sans-serif">Workflow container element Workitem : Creation Date !</font>
<br>
<br><font size=2 face="sans-serif">Mike</font>
<br>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td>
<td><font size=1 face="sans-serif"><b>"Dimitri Dupont" <Dimitri.Dupont@openhr.com></b></font>
<br><font size=1 face="sans-serif">Sent by: sap-wug-bounces@MIT.EDU</font>
<p><font size=1 face="sans-serif">03/03/2005 15:15</font>
<br><font size=1 face="sans-serif">Please respond to "SAP Workflow Users' Group"</font>
<br>
<td><font size=1 face="Arial"> </font>
<br><font size=1 face="sans-serif"> To: "SAP-WUG (E-mail)" <SAP-WUG@MIT.EDU></font>
<br><font size=1 face="sans-serif"> cc: </font>
<br><font size=1 face="sans-serif"> Subject: Get the launch date of a WF</font></table>
<br>
<br>
<br><font size=2><tt>Hello<br>
When I have the WorkItem ID of a WF how can I determine when the Workflow has been launched.<br>
There must be a standard function telling me that but I cannot lay a hand on it<br>
Thank you very much for your help<br>
Dimitri Dupont<br>
<br>
_______________________________________________<br>
SAP-WUG mailing list<br>
SAP-WUG@mit.edu<br>
http://mailman.mit.edu/mailman/listinfo/sap-wug<br>
</tt></font>
<br>
<br>