<br><font size=2 face="Arial">Hello,</font>
<br>
<br><font size=2 face="Arial">(SAP basis version &nbsp;6.2) </font>
<br><font size=2 face="Arial">I have an own developed workflow (part) which
works the following way:</font>
<br><font size=2 face="Times New Roman">- &nbsp; &nbsp; &nbsp; &nbsp;</font><font size=2 face="Arial">The
first synchronous step create output value to the workflow container</font>
<br><font size=2 face="Times New Roman">- &nbsp; &nbsp; &nbsp; &nbsp;</font><font size=2 face="Arial">The
second asynchronous step read this value from the workflow container.</font>
<br><font size=2 face="Arial">The workflow steps are drawn together with
<b><i>Advance with dialog flag = On.</i></b></font>
<br>
<br><font size=2 face="Arial">Phenomenon:</font>
<br>
<br><font size=2 face="Arial">Most of the cases this information exchange
works properly. </font>
<br><font size=2 face="Arial">Sometimes ( 2 from 1000 ) the value does
not propagate to the asynchronous task.</font>
<br><font size=2 face="Arial">The workflow container contains the values
to be propagated, but the container element of the asynchronous task is
initial.</font>
<br>
<br><font size=2 face="Arial">Any hints, </font>
<br>
<br><font size=2 face="Arial">&nbsp;Waiting for your help</font>
<br>
<br><font size=2 face="Arial">Arpad</font>
<br>
<br>
<br>
<br>
<br><font size=2 face="sans-serif">Vincze Árpád<br>
itelligence Hungary Kft.<br>
Váci út 141<br>
H-1138 Budapest<br>
<br>
Tel: &nbsp;(+36) 1 / 452 38-22<br>
Mob: (+36) 20 / 9533-578<br>
Fax: (+36) 1 / 452 38-39<br>
Arpad.Vincze@itelligence.hu<br>
http://www.itelligence.hu</font>