<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Getting missing work items to position under org unit</TITLE>
</HEAD>
<BODY>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">We have an org unit under which 2 new =
positions were added with 1 holder each on 10/19/2001.&nbsp; All =
positions are created by referencing a job, and we attach our customer =
tasks at the job level.&nbsp; The work items were sent to each org unit =
position (including these 2 new positions) on 11/30/2001.&nbsp; =
Unfortunately, a mistake was made and the customer task was not =
assigned to the jobs which describe these 2 new positions until =
12/3/2001.&nbsp; So there are no work items for the users under these 2 =
new positions.&nbsp; A previous step populated the workflow container =
with the positions of the org unit, and when I look at this current =
step the workflow container has all of the org unit positions except =
for these 2 new positions.&nbsp; Is there any way to dynamically change =
a workflow container in process by adding these 2 new positions, or is =
one of those instances the users are just going to have to live with =
the error?&nbsp; BTW, we're on 4.0B.</FONT></P>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">Thanks,</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Brad</FONT>
</P>
 
</BODY>
</HTML>