<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Adjust Requested Start Dates</TITLE>
</HEAD>
<BODY>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">I have a question about a WF running =
in our 46C environment.</FONT>
</P>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">We have created a WF that monitors the =
Expiration of Qualifications from the Object Type BUS7019.&nbsp; It =
starts a WF as soon a persons qualification is entered with a validity =
date.&nbsp; This WF waits out there until 30 days before the end of the =
validity period.&nbsp; At this point an email is sent to the person =
(this is where the requested start is maintained).</FONT></P>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">Here is my problem:</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">Currently there are 500 WF in process =
with requested start that is derived from the value =
BUS7019.QUALIFICATION.ENDDATE.&nbsp; The training groups is going to =
extend the validity on all the records to show 2 years instead of the =
original 1 year.&nbsp; How do I RESET the requested start on the =
existing Work Items to reflect the new longer period?</FONT></P>
 
<P><FONT SIZE=3D2 FACE=3D"Arial">Hope this makes sense?</FONT>
</P>
 
<P><B><FONT COLOR=3D"#000000" SIZE=3D2 FACE=3D"Arial">Brian =
Snyder</FONT></B>
<BR><B><FONT COLOR=3D"#800000" SIZE=3D1 =
FACE=3D"Arial">WaferTech</FONT></B>
<BR><B><FONT COLOR=3D"#800000" SIZE=3D1 =
FACE=3D"Arial">360.817.3141</FONT></B>
</P>
 
</BODY>
</HTML>