<br><font size=2 face="sans-serif">Has anybody used standard role 20000018 successfully? This role is for PM/SM work center persons. </font>
<br>
<br><font size=2 face="Arial">I get role resolution errors when I try to use this role in my workflow. I have setup several work centers but have assigned a responsible person to only one of them. I did this using the HR Assignment function within transaction IR02. The description for this role says "</font><font size=1 face="Arial">the integration switch HR-Logisitics must be set". How can I check this? </font>
<br>
<br><font size=1 face="Arial">Thanks,</font>
<br><font size=1 face="Arial">Tara</font>