<br><font size=2 face="sans-serif">Hello all workflow Guru's,</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp;I am posting this message again Just incase if I was not clear enough.</font>
<br>
<br><font size=2 face="sans-serif">Here is the situation I am facing. We have For example workflow for PO approval process. This August France is going live with release 4.6c. October of this year US will go live. When US go lives France is already in operation and PO approval process is going on. While France &nbsp;is live we will have HR data load going on in the first few weeks for the US. For this reason HR has to switch off PLOGI &nbsp;PLOGI in table T77S0. Which makes all the workflow dead. </font>
<br><font size=2 face="sans-serif">France is now affected because they are live.</font>
<br><font size=2 face="sans-serif">Is there any way we can keep the workflow functionality un affected by the HR data load???? Any HR config or Workflow setting which is required???</font>
<br>
<br><font size=2 face="sans-serif">Regards,</font>
<br>
<br><font size=2 face="sans-serif">Pallavika Patel<br>
317-433-3157</font>