<br><font size=2 face="sans-serif">Did anybody experience this?</font>
<br><font size=2 face="sans-serif">When HR data load is going on (integration) they have to turned off active plan version in table T77S0 PLOGI PLOGI empty.</font>
<br><font size=2 face="sans-serif">At this point all our workflow stops working. Event linkage is deactivated and even I can not see workflow definition using PFTC_DIS.</font>
<br>
<br><font size=2 face="sans-serif">Is there any way we can have workflow active while data load is going on?</font>
<br><font size=2 face="sans-serif">When in table T77S0 had entry PLOGI WORKF 01 during data load workflow linkage was active but I found note 10411 which was talking about deleting this entry.</font>
<br><font size=2 face="sans-serif">We are on R/3 4.6c </font>
<br>
<br><font size=2 face="sans-serif">Any Idea will be appreciated. Also, when we will go live around October , our existing production system will have workflow working but HR data load for new site will have PLOGI empty.</font>
<br>
<br><font size=2 face="sans-serif">Regards</font>
<br><font size=2 face="sans-serif">Pallavika Patel<br>
317-433-3157</font>