<br><font size=2 face="sans-serif">We would like to enable preventative maintenance items as workflows. &nbsp;For example, an air conditioning unit needs to be inspected every 12 months. &nbsp;When I examined the preventative maintenance BOR objects, I discovered that NO events were defined under 4.6B. &nbsp;My assumption is that events will have to be defined for each situation in which preventative maintenance is requested. &nbsp;Does SAP provide some sort of parameters table for keeping track of these conditions? &nbsp;How would this be related to the maintenance plan?</font>
<br>
<br><font size=2 face="sans-serif">If anyone has implemented preventative maintenance before, feel free to pass along any advise.</font>
<br>
<br><font size=2 face="sans-serif">Thanks,</font>
<br><font size=2 face="sans-serif">Dan</font>