<br><font size=2 face="sans-serif">Transaction IW22 (Change PM notification) allows me to change a maintenance notification to assign a responsible person under the task tab (for release 4.6b). This field is also known as the partner number, as defined to the QMSM table (Quality notifications). However, there are no entries in the table with a partner number entry, thus, none can be selected for this field. </font>
<br>
<br><font size=2 face="sans-serif">How is partner number established in SAP? Is it part of the human resources module (ie, a config issue whereby something needs to be turned on) or is there a step somewhere I've missed in utilizing these notifications?</font>
<br>
<br><font size=2 face="sans-serif">Much obliged,</font>
<br><font size=2 face="sans-serif">Dan</font>