<br><font size=2 face="sans-serif">Transaction IW22 (Change PM notification) allows me to change a maintenance notification to assign a responsible person under the task tab (for release 4.6b). &nbsp;This field is also known as the partner number, as defined to the QMSM table (Quality notifications). &nbsp;However, there are no entries in the table with a partner number entry, thus, none can be selected for this field. &nbsp;</font>
<br>
<br><font size=2 face="sans-serif">How is partner number established in SAP? &nbsp;Is it part of the human resources module (ie, a config issue whereby something needs to be turned on) or is there a step somewhere I've missed in utilizing these notifications?</font>
<br>
<br><font size=2 face="sans-serif">Much obliged,</font>
<br><font size=2 face="sans-serif">Dan</font>