Hi fellow workflowers,
I have a question/problem,
I want to assign a task to a responsible mrp controller of a network. I have
a network (ps) and when i change the mrp controller, i want the next task to
go to the new assigned mrp controller. Is it possible to assign variable
agents to tasks?
I work with 4.6B
Thanks
Stephan